My work related passion is the Offshore Oil & Gas industry. The last couple of years my experiences are in the electrical & instrumentation, detail engineering and construction and maintenance work preparations. During my career I have successfully completed several projects for ONEgas offshore (NAM) in corporation with several companies and disciplines. e.g. Flowline projects and Decomplex projects (L13C, K15A, K81). Afterwards I’m now working for Total E&P Nederland as Senior Electrical Maintenance Engineer. The challenges that come with these jobs are most satisfying. Working with people and dealing with complex situations is what I like to do the most. Creating efficient work area’s for the team is my ultimate goal and in relation with Safety this will be very effective. Within this way of work I find this is a very interactive approach to add more overall value to the company I’m work for.
Started a new job as Electrical Maintenance Engineer for Total E&P Nederland. This job has a lot of interesting challenges. Together with electrical offshore personal the greatest challenge was to organize all the required needs for correctives and preventive maintenance work orders for over 24 offshore locations. Within Total has a high focus on Safety and very good spirit from the people to work with. Also having the possibility to create a more efficient way of working of the inspection group within the electrical team.
Responsebilities and activities:
One of the largestes and complex ONEgas Decomplex Projects for NAM. 10 month of intense work preparation together with several companies and disciplines to accomplish a 48 day's of shutdown. Decomplexion is basicly by-passing the production process directly produce wetgas. Therefor instrumentation and DCS has been changed. At the end of this Project the Fire and Gas system has been changed out.
Responsebilities and activities:
Within the second fase of the K15A Decomplex Project we installed a new MCC and 3 containerized generators onto the platform. Complexity of this project was to transfer from the existing into the new power generation set within a 28 day's shutdown while running on a temporary power generator.
Responsebilities and activities:
The first Decomplex project for NAM K15-FA-1 platform. Here to transform a production platform with dry gas, into wetgas production. Directly the DCS system has been changed out with new Yokogawa DCS system. Shutdown of this platform was a periode of 35 days.
Responsebilities and activities:
E&I workpreparator for several modification projects on several NAM platforms. L13C Decomplex workprepation splitted into 13 modifications and workprepartion has been done in SAP Project module for project management. This was my first team Lead assignment for workprepartion E&I team. Decomplexion of L13-FC-1 platform where the complete process area has been by-passed for wetgas production and installed a completly new Yokogawa DCS system.
Responsebilities and activities:
Work preparations for Fabric Maintenance Barge Campaign. During the fabric maintenance serveral offshore platforms for ONEgas cross border has been sandgrinded and painted. Electrical has renewed all broken parts on the platforms. Workpackage preparations, planning and logistics. Materials ordering with SAP.
Fabric Maintenance Barge Campaign at the Atlantic Rotterdam. During the fabric maintenance serveral offshore platforms for ONEgas crossboarder has been sandgrinded and painted. Electrical has renewed all broken parts on the platforms. As Foreman E&I with a team of 3 technicians back to back we have worked together with companies Venko painting & Brand scaffold. Our purpus was to provide temporary lighting for 24hr shifts.
Flowline project assistention and coordination of planning, materials, boat & heli plannig and resources and Budget control. Tools used Primavera / SAP. Beside i have learned to use Excel VBA to create a estimating tool for AJS Estimations team.
During this period i have coordinated a special tools & equipments roll-out from NAM were all tools has been bought by NAM and distributed by BUS handelsmij b.v. Groningen. This to save budget on Rentals of tools on the main platforms. First time experience with SAP to create purchase orders.
Cluster platform coordination main platforms. planned basecrew and maximum pob per platform for all persons on board (POB). Heli booking and platform bed bookings up to the maximum of the platform.
Resource planner for all the AJS / NAM contractors to plan them to the NAM locations together with long term (90 days) and short term (30 days) planners. Make heli bookings and reserving platform beds. First time experience with Primavera enterprise 6.0.
As resource planner i was responsible to fill all the E&I technicians for all the NAM locations. Responsible for bookings / compentance and trainings.
Project planner assistance. My responsability was to coordinate first engineering survey's for multi disciplines. Late during the project i was coordinating project execution.
Worked together with Senior Electrical designer on part-time job to assist with CAD-Drawings. Also i have done my first site survey offshore trip on the NAM.K14FA1 platform.
Electrical technician on several NAM platform locations.
First time offshore as electrical technician on several NAM platform locations.
100 days of school internship for MBO graduation. I have learned to find system faults, testing equipments and replaced. Also i have learned to use PLC systems.
13 weeks of internship on Exxon mobile refinery in botlek. Here i have learned to install power cables, pumps motor. Also i have install emergency equipment for transform houses.
For low school i had my first experience to work. within 13 weeks i had to make same Autocad drawings under supervision for several projects. Tools ACAD 12 and some addons.
Course Energy technic and Measure and control technic.
Energy technic and Measure and control technic on technical high school.
Electrical installations on technical low school.
Apart from being a starter in web developer, I enjoy to be with friends and family. In other free time i'm
most of my time being outdoors. During the warmer months relaxing on the beach of Katwijk aan Zee. I enjoy
karting and suppen and also do activities with my little son. When forced indoors I like to do an Escape-room
and when at home i watch movies and television shows or listen music, watch snooker or chess. On available time
i like to search for tutorials to learn more of web developments.
One of the largestes and complex ONEgas Decomplex Projects for NAM. 5 month of intense work preparation together with several companies and disciplines to accomplish a 48 day's of shutdown. Decomplexion is basicly by-passing the production process directly produce wetgas. Therefor instrumentation and DCS has been changed. At the end of this Project the Fire and Gas system has been changed out.